Construction of the greenway along the Royal Canal @ 12th lock

This entry was posted in Uncategorized. Bookmark the permalink.

3 Responses to Royal Canal Greenway

  1. Baptiste says:

    Hi,

    Does anyone know when are the roadworks planned to be finished on the path between Ashtown and Castlenock ?

    Thanks,
    Baptiste

    • ngalway says:

      I am awaiting confirmation of the end date, but I believe April. As soon as I can confirm this I will post it here

      Many thanks

      Niall G

  2. Baptiste says:

    The tarmacadam is finished on the whole way. It seems that it will be opened on June 20th:
    http://irishcycle.com/2014/06/02/how-the-royal-canal-greenway-is-progressing-in-dublin/

    Thanks !